New editorial workflows
TYPO3 14.3 LTS guides editors through creating a page. We include changes like this in upgrade preparation and work through the new process with the editorial team.
Product view: © TYPO3 GmbH
TYPO3 14.3 LTS — official release screenshots
When does security support end?
Free security support for the LTS branches. Extensions, PHP and your hosting environment need their own compatibility checks.
TYPO3 12
Security updates until
30 April 2026
TYPO3 13
Security updates until
31 October 2027
TYPO3 14
Security updates until
30 June 2029
TYPO3 12: free security support ended on 30 April 2026. For installations still running this version, review an upgrade or separately licensed Extended Long Term Support (ELTS). ELTS is not included in the bars above.
- Prepare a TYPO3 13 installation for the next LTS release.
- Move from TYPO3 12 or an older version as regular support or compatible runtimes expire.
- Resolve extensions, site packages or integrations that prevent security updates.
- Coordinate changes to PHP, the database, hosting or deployment with the CMS.
- Introduce TYPO3 14’s improvements without a full website relaunch.
- Establish the technical facts before agreeing a budget or deadline.
- Compatibility matrix for TYPO3, PHP, Composer, database, web server, Redis, search and other infrastructure
- Extension inventory covering business purpose, ownership, upgrade path and alternatives
- Custom extension updates for core APIs, deprecated features, breaking changes and security, backed by automated tests
- Site package, Fluid templates, Site Sets, configuration, content elements and integration updates
- Hosting checks covering PHP modules, filesystem, cronjobs, scheduler, email, caches, certificates and server limits
- Trial migration in a separate environment with documented upgrade wizards and data changes
- Automated and manual checks of functionality, editing, browsers and regressions
- Checks of URLs, redirects, metadata, structured data, sitemap, accessibility and performance
- Repeatable build, environment configuration, database migration, cache warm-up and controlled activation
- Verified backup and recovery, agreed maintenance window and post-release checks of logs, jobs and performance